Skip to content ↓

October 23

External construction works have included new windows and doors, extensive internal refurbishment, and the inclusion of a new roof over the quad area to provide an impressive exhibition and performance space. The completion of these workstreams mark key milestones in the redevelopment of the Grammar School building.

The external façade will recreate the original aspect dating back to the 1930s, whilst the internal spaces are undergoing full modernisation to align with the contemporary needs and aspiration for the building.

  • thumbnailIMG88081)

    thumbnailIMG88081).jpg
    46
    thumbnailIMG88081)
  • thumbnailIMG88061)

    thumbnailIMG88061).jpg
    45
    thumbnailIMG88061)
  • thumbnailIMG88041)

    thumbnailIMG88041).jpg
    44
    thumbnailIMG88041)
  • thumbnailIMG88031)

    thumbnailIMG88031).jpg
    43
    thumbnailIMG88031)
  • thumbnailIMG88021)

    thumbnailIMG88021).jpg
    42
    thumbnailIMG88021)
  • thumbnailIMG88011)

    thumbnailIMG88011).jpg
    41
    thumbnailIMG88011)
  • thumbnailIMG88001)

    thumbnailIMG88001).jpg
    40
    thumbnailIMG88001)
  • thumbnailIMG87981)

    thumbnailIMG87981).jpg
    39
    thumbnailIMG87981)
  • thumbnailIMG87911)

    thumbnailIMG87911).jpg
    38
    thumbnailIMG87911)
  • thumbnailIMG88121)

    thumbnailIMG88121).jpg
    47
    thumbnailIMG88121)
  • thumbnailIMG87891)

    thumbnailIMG87891).jpg
    48
    thumbnailIMG87891)